FLOYDCOUNTYGA.ORG
Floyd County Government Online

     
Find It Fast Menus
 
Home       About Floyd      Commissioners      Minutes       GIS/Maps       WebMail       Links & Resources       Directions      Contact Us

Permits
Commercial Development
Subdivision Development
Survey Approvals
Details & Standards
Engineering Resources
Sewer Department
Water Department
Erosion Control
Roadway & Drainage Maintenance
City of Rome Engineering Department
Floyd County / City of Rome Road Map (pdf file)
Floyd County / City of Rome Roadway map with zoning (pdf file)

 

 




OUR MISSION:
FLOYD COUNTY GOVERNMENT IS COMMITTED TO CREATING A CLIMATE THAT PROMOTES ECONOMIC DEVELOPMENT, COMMUNITY CONSCIOUSNESS, AND A SAFE ENVIRONMENT. WE ARE DEDICATED TO SERVICE EXCELLENCE THAT ENHANCES THE QUALITY OF LIFE.

 



IN THE NEWS




2006 SPLOST Web Site
For SPLOST Committee Updates, please click on the link above.


Floyd County's 2006 Audit
Year Ending 12/31/06



Working on Wellness

Pollution Hotline & Stormwater Management

Leaf Season Begins October 1

Floyd County Board of Jury Commissioners
Jury Box Questionnaire & Affidavit

Water Conservation Tips

Outdoor Water Use Schedule

Floyd County Animal Control Adopts New Animal Rescue Procedures

Pandemic Flu Preparedness Information
Información de Estado de preparación de Gripe Pandémica



UPCOMING EVENTS




January 8, 2008 -
noon: Caucus
2 p.m.: Meeting

January 22, 2008 -
4 p.m.: Caucus
6 p.m.: Meeting

February 5, 2008 -
(this meeting date was originally scheduled for Feb. 12, but due to an ACCG conflict, was moved up one week)
noon: Caucus
2 p.m.: Meeting

February 26, 2008 -
4 p.m.: Caucus
6 p.m.: Meeting

*Please note, the Commission meetings are now being held in the new Community Room - located on the 2nd Floor of the Administration Building - 12 East 4th Avenue.


To view recent meeting minutes, please click on the logo above.

Subdivision Development


The residential subdivision development process is comprised of four primary phases:
-Preliminary Plat Approval
-Development Plans Approval
-Final Plat Approval
-Construction Inspection
Article Six (6) of The Unified Land Development Code (ULDC) of Floyd County and The City of Rome outlines the requirements for plat/plan development, plan submittal, and the approval process for each phase. The procedures for design and approval of private subdivisions are the same as those for subdivisions with public improvements.

All subdivision development plans and specifications must be submitted to the Floyd County Engineering Department for review and approval prior to the issuance of a Land Disturbance permit. Ten (10) sets of plans with specifications and reports are required for this submittal. The Engineering Department will forward portions of the development plans to other city/county departments as part of the review and approval process as applicable.

Sewer plans and specifications are reviewed and approved by The City of Rome Engineering Department. Water plans and specs are renewed and approved by The Floyd County Water Department. Erosion and Sediment control plans are reviewed and approved by The City of Rome Building Inspection Department. All other plans are reviewed and approved by the Floyd County Engineering Department. The developer/owner will be notified of required revisions and must coordinate such revisions with the respective reviewing department.

Approval of the development plans and specifications by Floyd County shall not imply of transfer acceptance of responsibility for the application of the pronicpals of engineering, architecture, landscape architecture or any other profession, from the professional, corporation or individual under whose hand or supervision the plans were prepared.

The Floyd County Engineering Department will conduct inspections of all construction activities to include storm drainage and detention pond construction, grading, roadway sub-grade construction, curb and gutter construction, roadway base construction, and paving construction. All inspection requests must be made at least 24 hours prior to planned inspections. Approval must be given on all phases of construction prior to acceptance by Floyd County.

Approval of construction activities by Floyd County shall not imply or transfer acceptance of responsibility for construction activities, techniques or constructed infastructure from the owner/developer, contractor, or any other corporation or individual completing work on behalf of the owner/developer.

A final plat must be prepared and submitted to the Floyd County Engineering Department when all construction activities are completed and aproved. Ten (10) copies of the final plat must be submitted by the 2nd Monday of each month to be presented at the following months Planning Commission Meeting, which is the 1st Thursday of each month. The ULDC details the requirement for the final plat review process. Following approval from the Planning Commission, the final plat can be recorded and lots may be sold.

Return to Engineering Department Home Page

Home       About Floyd      Minutes      GIS/Maps       WebMail       Links & Resources     Directions     Contact Us
12 East 4th Avenue, Rome, Georgia 30161
Copyright 2005, Floyd County Board of Commissioners

Privacy and Usage Statement